Sunday, December 23, 2012

The head is behind us now...Part deux

Another handy piece of advice, one I learned after the fact, Do not set the toilet back in until all of the woodwork is back in it's place. There are certain pieces that were a bear to put back on with the toilet in the way.

Speaking of toilets, after filling and then re drilling the holes, I used life-calk and stainless steel lag bolts to reset it. I also added the mahogany trim to the water lines for the toilet as they were barely screwed into place with some drywall screws.


The shelf inside the bottom cabinet was also pulled and refinished while I had everything apart.

This is the fore hose that is behind the upper cabinet in the head...It's for the main bilge pump
This is the aft hose behind the upper cabinet in the head... It's for the shower bilge pump
I also replaced the bilge pumps thru hulls as they were nothing but a tube sticking out of the side.

Done for now. After the holidays I will continue working on the cabin woodwork and the next major project until the spring/summer haul out will be redoing the galley. So stay tuned...

No comments:

Post a Comment